Posted By John Poindexter

We worked last Saturday and installed the engraved bricks up to the gazebo.

We are still waiting on the tables and then after the gazebo is finished, I will plant some bushes along the alley.  Hope to get a tree before too long, but may not until August.

 

Name Bricks
 

 


 
Posted By John Poindexter

Hi,

We worked our last Saturday and finished up the walkways and planted the last flowers. Now we wait until the gazebo is finished by that crew, so we can put in the tables and the engraved brick walkway. Still need to add some mulch as we ran out, but for the most part we are through.

Serenity Gardens Walkway
 


 
Posted By John Poindexter

Serenity Gardens
We started working today by putting in the 7 benches and the foot path made of bricks that look like feet.

We still have the plants and some shrubs along with a Christmas Tree to put in yet.

We will work the next two Saturdays to finish up.

Here is a picture.

 


 


 
Posted By John Poindexter

Serenity Garden Work Begins!

 

We are hoping to have all the benches and tables delivered to us so that we can install them on May 9th.

We will also be digging out the footpaths and walkway, along with a hole for the Christmas tree.

Everyone is invited to help. Just bring shovels, gloves to protect your hands, hoses for water.

We have two more scheduled work days on the 16th and 23rd.  I am hoping to have the plants by the 23rd so they can be put in.

 

Engraved bricks will have to wait until after the cement pad is poured for the gazebo before they are put in.

 

 


 
Posted By John Poindexter

On the Serenity Gardens Project, BRICK SALES ARE OVER!